Make the plan usable.
Daily and weekly work planning, site coordination, and managing labour and machinery around the sequence of construction.
Civil engineer · Nepal
The work is measured in drawings and deadlines. The reason for doing it is people who depend on what we build.
Site Engineer at Bandan Bhagwati Nirman Sewa · team profileNEPAL ENGINEERING COUNCIL · LICENSED CIVIL ENGINEER

The through-line
Good construction is a thousand careful decisions, made well before anyone calls it finished.
I’m Bibek, a licensed civil engineer in Nepal. I work where plans meet the realities of a live site: coordinating people, sequencing work, and keeping construction true to its drawings.
My experience has moved from site supervision to project engineering and now site engineering. Across each role, I’m drawn to the same question: how do we make infrastructure work reliably for the people who use it?
Practical on site. Curious about the systems behind it. Always thinking about what lasts.
| A | Site supervision | 2023 |
|---|---|---|
| B | Project engineering | 2024 |
| C | Site engineering | 2025 → |
“A line can connect a calculation to a community.”
Current work, seen from the ground: setting out, gabion walls, formwork, reinforcement and the pour.
TAP A PHOTO TO ENLARGE
Daily and weekly work planning, site coordination, and managing labour and machinery around the sequence of construction.
Working with drawings, timelines, budgets and project teams to keep execution aligned with the intended design.
Current — Site Engineer, Bandan Bhagwati Nirman Sewa Pvt. Ltd. · Previously — Construction Project Engineer, Tundi Group; Construction Supervisor Intern, Bodhi Holding.
Pokhara University · 2023
Nepal College of Information Technology, Kathmandu
A risk information model that links BIM objects, temporary works, schedule windows and exposed groups, with a likelihood–consequence–exposure screening index and an eight-step 4D workflow for reassessing hazards as construction changes.
Engineers Without Borders Nepal recognised my contribution to Disaster Risk Reduction workshops: helping develop learning materials, support workshop logistics, and bring a civil engineering perspective to conversations on resilient infrastructure.
October 2024 — February 2025 · Issued 15 February 2025

Hi! Ask me anything about Bibek's work, experience, research or how to reach him.
ANSWERED BY OPENAI GPT (THE MODEL BEHIND CHATGPT) FROM BIBEK’S CV · FOR ANYTHING ELSE, EMAIL HIM
Free guides and my own real application documents: how to build an academic CV, how to write to professors, and the statements of purpose I sent to 9 US universities.
Let’s talk about what we can build better.
For engineering work, research collaboration, or graduate study, email is the best way to reach me.